Rebranding? How to Update Your Business Signage Strategically
A rebrand is exciting—new logo, new colors, new identity, new possibilities. But alongside the excitement comes a practical challenge: you have signage everywhere displaying your old brand, and it all needs to change.
How you handle signage during a rebrand affects cost, timeline, and how smoothly your transition is perceived. Rush everything at once and you'll overspend and create logistics nightmares. Wait too long and you'll confuse customers with mixed messaging.
At InstaSIGN, we've helped Palm Beach County businesses navigate rebrands since 1986. Some have been smooth and strategic; others have been chaotic and expensive. Here's what we've learned about doing it right.
Rebranding Signage Realities
It's Bigger Than You Think
Most businesses underestimate their signage inventory. Beyond the obvious building sign, you likely have:
- Interior signs and wayfinding
- Vehicle graphics
- Window decals
- Menu boards and displays
- Promotional materials and banners
- Digital presence (not signage, but related)
A complete inventory often surprises business owners. Everything with your old logo needs attention.
It Costs More Than You Expect
New signage for everything adds up quickly. Prepare for sticker shock when you tally the true cost of comprehensive signage replacement.
Budget realistically from the start. Don't let signage costs derail your rebrand because they weren't anticipated.
Timing Matters
A rebrand should feel cohesive. Customers seeing your old logo on the building, new logo on the door, and different logo on the menu get confused. Plan timing to maintain consistency.
Strategic Prioritization
You don't have to (and probably shouldn't) change everything simultaneously. Prioritize strategically:
Priority 1: Primary External Identification
Your most visible signage—the sign(s) that identify your business to the public:
- Building-mounted main sign
- Monument or pylon signs
- Primary storefront identification
These create first impressions and should change early in your transition.
Priority 2: Customer-Facing Entry Points
What customers see as they approach and enter:
- Door graphics
- Entry way signage
- Reception/lobby signage
- Window graphics (if prominent)
These touch points should align with primary identification.
Priority 3: High-Visibility Interior
Interior elements that customers regularly see:
- Menu boards
- Point-of-sale displays
- Prominent wall signage
- Customer-facing service areas
Update these to complete the customer-facing transition.
Priority 4: Secondary Interior
Less visible interior signage:
- Wayfinding and directional signs
- Room identification
- Back-of-house signage
- Employee-facing materials
These matter less for customer perception and can wait slightly longer.
Priority 5: Peripheral and Temporary
Elements that change naturally or matter least:
- Promotional materials (design new ones as needed)
- Temporary displays (phase out old, phase in new)
- Items with natural replacement cycles
Don't pay to replace things that would be replaced anyway.
Phased Implementation
The Coordinated Launch Approach
Some businesses prefer a "big reveal"—everything changes at once. This requires:
- Complete signage inventory and production before launch
- Coordinated installation (often overnight or over a weekend)
- Significant upfront capital
The Rolling Transition Approach
Other businesses prefer phased implementation:
- Primary identification changes first
- Additional elements follow over weeks or months
- Budget spreads across time
The Hybrid Approach
Many businesses combine elements:
- Customer-facing signage changes in coordinated launch
- Non-customer-facing elements phase in over time
- Natural replacement cycles handle peripheral items
This balances polish with practicality.
Budget Strategies
All-At-Once Budgeting
If you're doing a coordinated launch:
- Get complete quotes for all signage before committing
- Include installation, permits, and contingency
- Secure funding before starting production
- Build in 10-15% contingency for surprises
Phased Budgeting
If implementing in phases:
- Allocate budget by phase/priority
- Plan cash flow across the timeline
- Track actual spending against projections
- Adjust later phases based on early phase actuals
Cost-Saving Opportunities
Some strategies reduce rebrand signage costs:
Partial updates — Can faces be replaced while structures remain? Channel letter face replacements cost less than full new letters. Overlay graphics — Sometimes existing signage can be overlaid with new graphics rather than fully replaced. Timing flexibility — Rush timelines cost more. Allow adequate production time. Bundled work — Doing multiple locations or elements together may earn volume pricing.Common Rebranding Signage Mistakes
Underestimating Inventory
Forgetting about signage until you find old logos months into your "complete" rebrand. Do thorough inventory before starting.
Rushing Production
Trying to do everything in two weeks when four weeks is realistic. Rush fees add up, and mistakes happen when timelines are too tight.
Inconsistent Timeline
Customer-facing signage still showing old branding while marketing materials show new. Coordinate across all customer touchpoints.
Neglecting Permits
Assuming you can just swap signs without permits. Many jurisdictions require permits even for face changes. Build permit time into your timeline.
Forgetting Interior
Focusing on exterior signage while interior remains unchanged. Customers who enter see the disconnect.
Ignoring Vehicles
Vehicle wraps showing old branding while building shows new. Vehicles are highly visible—include them in planning.
Working with Your Sign Company
Early Engagement
Involve your sign company early in rebranding planning:
- They can provide realistic cost estimates for budgeting
- They can assess what existing signage can be modified versus replaced
- They can identify permit requirements that affect timeline
- They can plan production capacity around your needs
Clear Brand Guidelines
Provide complete brand guidelines:
- Logo files in appropriate formats (vector preferred)
- Color specifications (Pantone, CMYK, RGB)
- Typography standards
- Usage rules and prohibited treatments
Incomplete guidelines create costly revisions and inconsistency.
Coordination Planning
Plan the coordination:
- Who approves designs?
- How are installation schedules set?
- Who coordinates access at each location?
- What's the communication process for issues?
Complex rebrands require project management attention.
Multi-Location Considerations
Businesses with multiple locations face amplified challenges:
Consistency
All locations should appear consistently branded after transition—same signage styles, same quality, same brand expression.
Logistics
Multiple locations mean multiple installations to coordinate, potentially across different municipalities with different permit processes.
Phasing Options
Multi-location businesses can phase by:
- Location (complete one location before starting next)
- Element (all building signs first across locations, then interiors)
- Region (geographic groupings)
Choose based on your operational realities.
Franchise Considerations
Franchisees may have brand compliance requirements from franchisors—timelines, approved vendors, specification requirements. Understand these before planning.
After the Transition
Confirm Completion
Audit all locations to confirm old branding is fully removed. Missed items will surface eventually—better to find them proactively.
Document New Signage
Photograph and document all new signage for:
- Insurance records
- Maintenance planning
- Future reference
Maintenance Planning
New signage needs ongoing care. Establish maintenance schedules and budgets.
Disposal of Old Signage
Old signs need proper disposal. Some materials can be recycled; others require special handling. Plan for disposal costs and logistics.
Frequently Asked Questions
How long does a complete signage rebrand take?Depends on scope and approach. Simple single-location rebrands might complete in 4-8 weeks. Multi-location or complex rebrands can take months. Plan conservatively—signage often takes longer than expected.
Can I keep my existing sign structures and just change the graphics?Often yes. Channel letter faces can be replaced, cabinet sign faces can be changed, and some graphics can be overlaid. Assessment determines what's possible for your specific signs.
What if my landlord requires signage approval?Build landlord approvals into your timeline. Some landlords have specific requirements about sign types, sizes, or appearance. Get approvals before ordering.
Should I announce the rebrand before or after signage is complete?Ideally, primary signage changes align with public announcement. Announcing too far ahead creates a gap where old signage contradicts new messaging.
Who handles permits—me or the sign company?Typically the sign company handles permit applications. Understand permit timelines for your locations and build them into planning.
---
Planning a rebrand? Contact InstaSIGN at (561) 272-2323. We'll help you inventory your signage, plan a strategic transition, and execute efficiently across your Palm Beach County locations.
